Heath Farm

Holt, Norfolk

 

Eaves to Ridge Smartroof System with Timber Dormers & Front Pediment

 

Install Time
1 roof in 1 day

Architect
Chaplin Farrant Ltd

Lovell Homes previously used traditional methods in the construction of its three storey homes in a process involving masonry gables, attic trusses and hand cut pediments. The Smartroof system was installed in 1 day.

Maintaining maximum site safety was a concern due to the extensive working at height plus the risk of collapse of masonry gable walls during installation. Mitigation methods for these safety issues required the use of both internal and external scaffolding with associated costs. The Smartroof installation process eliminated these risks.

I was very impressed with the entire Smartroof process from design to installation and I will definitely use the system on future projects.

Chris Nelson
Contracts Manager, Lovell Homes